SilInfra — Your Power Partner

PM Surya Ghar, step by step

Muft Bijli Yojana: up to ₹78,000 central subsidy + a collateral-free 7% loan for residential rooftop solar. Here's exactly how it works — and what we handle for you.

Maximum
₹78,000 central subsidy
Loan
~7% p.a. · up to ₹2,00,000
Turnaround
4–8 weeks end to end
Vendor
SilInfra Solar — registered
Schedule of subsidy slabsCentral subsidy · residential
1 kW system
₹30,000central subsidy, paid to your bank
2 kW system
₹60,000central subsidy, paid to your bank
3 kW + system
₹78,000central subsidy, paid to your bank

Subsidy is capped at the 3 kW slab — larger residential systems still receive ₹78,000. See your exact numbers →

Housing societies · GHS & RWA

Registered housing societies and RWAs get ₹18,000 per kW for solar powering common facilities — lifts, pumps, common lighting, even EV charging — for systems up to 500 kW(cap includes members' individual rooftop systems). Members can separately claim the individual slabs on their own flats' share. The calculator has a dedicated Housing society mode →

Legend · state top-ups

Uttar Pradesh
+₹15,000/kW (max ₹30,000) via UPNEDA — reimbursed after commissioning; limited to the first 1,00,000 installations.
Maharashtra (SMART)
+₹10,000–₹17,500 for eligible EWS/BPL households (~1 kW, under 100 units/month) via MSEDCL.
Delhi
+₹2,000/kW (max ₹10,000) plus a generation-based incentive of up to ₹3/unit on your bill.

Other states currently ride on the central subsidy alone; schemes change — we verify what applies to you during the free survey.

Order of works06 steps · ~45 days

The 6-step application

  1. 01

    Register on the national portal

    Sign up at pmsuryaghar.gov.in with your state, DISCOM, consumer number and mobile. Takes ~10 minutes with a recent electricity bill in hand. (As our customer, we do this with you.)

  2. 02

    Apply for rooftop solar & pick a registered vendor

    Submit the online application and select a DISCOM-registered vendor — SilInfra Solar is a PM Surya Ghar registered vendor. System size is set by your consumption; the subsidy maxes out at 3 kW.

  3. 03

    DISCOM feasibility approval

    Your DISCOM checks the connection and sanctions the capacity — typically within 15 days. Nothing is installed before this approval.

  4. 04

    Installation by the vendor

    We install the plant with ALMM-listed modules and BIS-certified inverters (both are subsidy requirements), then register the plant details on the portal.

  5. 05

    Net meter + inspection

    The DISCOM installs a net meter and inspects the plant. After commissioning, the portal generates your commissioning certificate.

  6. 06

    Subsidy lands in your bank account

    Submit bank details + a cancelled cheque on the portal — the central subsidy is credited directly to your account, typically within 30 days of commissioning.

The SilInfra shortcut: as a registered vendor we run steps 1–6 for you — portal registration, DISCOM paperwork, net-meter application and the subsidy claim. You sign; we chase.

Schedule of tariffsRepresentative · ₹ per unit

What a solar unit is worth in your state

Every unit you self-consume saves your provider's effective rate (energy charge + fuel surcharge + duty); surplus exports settle at a lower rate. Representative figures — your bill decides the exact rate.

StateProviders (DISCOMs)Effective rate ₹/unitSurplus export ₹/unit
GujaratTorrent Power · Urban (GEB / UGVCL·MGVCL) · Rural (GEB / DGVCL·PGVCL)7.5–14.0~2.25
MaharashtraMSEDCL (Mahavitaran) · Adani Electricity (Mumbai) · Tata Power (Mumbai) · BEST (Mumbai)8.7–13.9~2.82
DelhiBSES Rajdhani · BSES Yamuna · Tata Power-DDL5.0–5.2~2.00
RajasthanJaipur Vidyut (JVVNL) · Ajmer Vidyut (AVVNL) · Jodhpur Vidyut (JdVVNL)8.1–8.1~3.26
KarnatakaBESCOM (Bengaluru) · HESCOM / MESCOM / others7.0–7.6~2.93
Tamil NaduTNPDCL (ex-TANGEDCO)6.0~0.00
TelanganaTGSPDCL / TGNPDCL6.8~2.00
Andhra PradeshAPSPDCL / APEPDCL / APCPDCL6.8~2.09
Uttar PradeshUPPCL (PuVVNL/MVVNL/etc.)6.2~2.00
Madhya PradeshMP Poorv/Paschim/Madhya Kshetra7.5~2.14
West BengalWBSEDCL · CESC (Kolkata)8.4–9.0~0.00
HaryanaUHBVN (North) · DHBVN (South)5.3–5.3~0.00
KeralaKSEB8.8~3.20
ChhattisgarhCSPDCL6.3~2.00
OdishaTP Central/Southern/Western/Northern5.7~0.00
Queries raised05 on file

PM Surya Ghar FAQ

Q01
How much subsidy will I get?
₹30,000 for a 1 kW system, ₹60,000 for 2 kW, and ₹78,000 for 3 kW or larger. The subsidy is fixed above 3 kW — a 5 kW system still receives ₹78,000.
Q02
Who is eligible?
Residential consumers who own their house with a valid electricity connection and roof rights. The house must not have availed an earlier rooftop-solar subsidy, and the equipment must be ALMM/BIS-compliant, installed by a registered vendor.
Q03
What documents do I need?
Recent electricity bill, proof of ownership (property tax receipt / sale deed), a photo of the roof, Aadhaar, and bank details with a cancelled cheque for the subsidy transfer. Your vendor uploads the technical documents.
Q04
Is there really a 7% loan?
Yes — collateral-free loans up to ₹2,00,000 at ~7% p.a. for up to 10 years for residential systems up to 3 kW, available through most public-sector banks and linked from the PM Surya Ghar portal. The EMI is often lower than the electricity bill the system replaces.
Q05
How long does the whole process take?
Typically 4–8 weeks end to end: portal registration and DISCOM feasibility (~2-3 weeks), installation (2-3 days on site), then net-meter installation, inspection and subsidy disbursal (~2-4 weeks). SilInfra handles every step of the paperwork.

Send a surveyor to my roof

We measure the roof, read your last twelve bills, and come back with a sized system, a real yield figure and a price that does not move afterwards.

Costs you
Nothing — the survey is free
Commits you to
Nothing — walk away after the proposal
Reply within
One business day
Have ready
Twelve months of electricity bills